Fasfox digitized Razel-Bec's workforce management on a major Grand Paris Express construction site
Razel-Bec, the public works subsidiary of the Fayat group, has been building infrastructure in France and abroad for 140 years. The company works on several civil engineering sites of the Grand Paris Express.
Challenges
Razel-Bec was selected by RATP to build 5 stations and 12 ancillary structures for the southern extension of Paris Metro Line 14. The project involves around a hundred companies and more than 1,500 employees across 17 separate sites. Keeping administrative track of all employees over the 3 years of works is essential to the project’s success. Razel-Bec needed to check that every worker on site was administratively compliant, held the training and certifications required for the work to be carried out, and could be managed logistically whatever their site.
Missions
- Development of a web application to store and view all workforce data
- Specific approval workflows between subcontractors, temporary staffing agencies and Razel-Bec
- Four user profiles: administrative, HSE (health, safety and environment), logistics and subcontractor
- Automated PDF and Excel exports to meet the requirements of RATP and inspection bodies
- Development of a mobile app used directly on site for safety monitoring
Results
- Significant reduction in time spent on employee administration
- Simpler procedures with the various parties involved in the project: client, design and construction supervision team, health and safety coordinator, labor inspectorate, etc.
- Stronger risk prevention thanks to more reliable safety monitoring
- Better relationships with subcontractors, with easier exchanges through the platform